Archive

Posts Tagged ‘demolition survey’

Management Surveys and Refurbishment and Demolition Surveys.

May 14th, 2010

Asbestos Management Surveys and Refurbishment and Demolition Surveys.

The type of survey will vary during the lifespan of the premises and several maybe needed over time. A Management Survey will be required during the normal occupation and use of the building to ensure continued management of the ACMs in situ. A refurbishment or demolition survey will be necessary when the building (or part of it) is to be upgraded, refurbished or demolished. It is probable that at larger premises a mixture of survey types will be appropriate, eg a boiler house due for demolition will require a refurbishment/demolition survey, while offices at the same site would have a management survey. In later years refurbishment surveys may be required in rooms or floors which are being upgraded.

In sectors where there are large numbers of properties (eg domestic houses) or internal units (eg hotels), only particular rooms may be specified for upgrading, eg kitchens, bathrooms and bedrooms. Refurbishment surveys would only be necessary in these locations.  It is important that the client and the surveyor know exactly what type of survey is to be carried out and where, and what the specification will be. So there should be a clear statement and record of the type of survey that is to be carried out, including the reasons for selecting that type of survey, and where it is to be carried out.

Need advice and information on Asbestos surveys? you should contact Veritas Health and Safety Consultants 0121 249 1281

Update me when site is updated

safetymatters asbestos management ,

The Asbestos Surveyors Guide – Asbestos Survey Guidance MDHS100

April 14th, 2009

 

New HSG guidance document, “Asbestos surveyors Guide – Surveying, sampling and assessment of asbestos-containing materials. (Out Aug 2009)

The new asbestos survey guidance document, “Asbestos surveyors Guide – Surveying, sampling and assessment of asbestos-containing materials aims to help asbestos surveyors and duty holders ensure that proposed asbestos survey methods and procedures are appropriate for the situation and are able to be managed in sound and operational for all asbestos survey situations.

There are currently 3 methods of Asbestos survey as described within the surveyors guide (MDHS 100) a Type 1 asbestos survey, Type 2 asbestos survey and Type 3 asbestos survey of which in the near future, (subject to approval by HSE) will be revised to include 2 types of asbestos survey namely “management surveys” and “demolition/refurbishment” surveys.
Read more…

Update me when site is updated

safetymatters asbestos management , , , , ,