On all non domestic construction projects, the Client is required to:-
• Check competence and resources of all appointees
• Ensure there are suitable management arrangements for the project including welfare facilities
• Allow sufficient time and resources for all stages
• Provide pre-construction information to designers and contractors

 

Additionally, on Notifiable* projects, the Client is required to:-
• Appoint CDM Co-ordinator
• Sign the declaration to HSE
• Appoint Principal Contractor
• Make sure that the construction phase does not start unless there are suitable welfare facilities and a construction phase plan in place
• Provide information relating to the health and safety file to the CDM Co-ordinator
• Retain and provide access to health and safety file

* Notifiable projects are those with an estimated construction period longer than 30 working days or involving more than 500 person days.

 

This summary is based on paragraph 23 of Managing Health and Safety in Construction, the approved code of practice under the Construction (Design and Management) Regulations 2007. Reference should be made to that document for full details of the Client’s duties.

 Competent CDM Coordinator

As competent CDM Coordinators, Veritas Consulting are able to fully advise Client’s on all matters relating to the Construction (Design and Management) Regulations 2007. Get in touch 0121 249 1281.

 

About 

Director at Veritas Consulting. 20+ years as a Chartered Safety and Health Practitioner with a brain you can pick. A trusted, risk savvy portfolio professional who is fluent in practical advice and an effective workplace solutionist.

You can find him on - Twitter and Facebook also Linkedin

This post has been filed in: CDM Regulations, Construction, Health and Safety Law

2 Comments

  1. noel
    October 12, 2009 at 8:24 pm

    Question 1.
    What part of the CDM is detailed under the HSWA 74, is the HSWA 74 made up of a list of bodies that work under the act?

    What other regulations are listed within the Act,,,student learning ONC–

  2. safetymatters
    October 12, 2009 at 8:50 pm

    The Health and Safety at Work etc Act 1974 is the primary piece of legislation covering occupational health and safety at work in the UK.

    The HSE is responsible for enforcing the Act and a number of other Acts and Statutory Instruments relevant to the working environment.

    The CDM Regulations 2007 (Construction Design and Management) are amongst many secondary pieces of Legislation made under the HASAW Act which are available on the HSE website here > http://www.hse.gov.uk/

    Hope this answers your question.

Post a Comment

Your email is never published nor shared. Required fields are marked *

*
*

(Spamcheck Enabled)

Latest Blog Posts
Lessons from history – the Sampoong department store disaster Lessons from history – the Sampoong department store disaster The collapse of a department store building 28 years ago still has lessons for construction... Read More
How to choose the right dust masks for your team How to choose the right dust masks for your team Dust masks are an essential item of personal protective equipment (PPE), preventing workers from... Read More
Health and Safety lessons from Carillion Health and Safety lessons from Carillion The collapse of Carillion comes as a significant blow to the UK construction industry – particularly smaller businesses... Read More
Follow all of the latest Veritas Consulting news on our RSS feed
Shares